PROJECT-SPECIFIC SUPPLEMENTAL TERMS, ASSUMPTIONS, AND EXCLUSIONS

PROJECT LOGISTICS

  • Hoisting and material handling equipment included as required
  • Dumpsters and debris removal included
  • Site access, staging, and material storage coordinated with owner or general contractor
  • Building to be watertight every night

PROJECT EXECUTION APPROACH

  • Safety procedures and site protection maintained at all times
  • Daily cleanup and final punch list completion included

ASSUMPTIONS

  • Proposal is based on [site visit / drawings / specifications]
  • No destructive testing has been performed unless otherwise noted
  • Existing conditions are based on visible inspection only
  • Existing substrate and structural conditions are assumed to be suitable unless otherwise noted
  • Access to work areas will be provided by others

EXCLUSIONS & CLARIFICATIONS

  • Payment and Performance Bonds are excluded unless otherwise noted
  • Pricing is based on continuous work and may be adjusted for schedule disruptions, phasing changes, or delays beyond contractor control
  • Sales taxes are excluded unless otherwise noted
  • Removal, handling, or disposal of hazardous materials, including but not limited to asbestos-containing materials, is excluded
  • All work not specifically identified in the Scope of Work is excluded
  • Structural repairs, engineering, and design are excluded unless specifically noted
  • Roof curbs, equipment removal, roof deck cutting, and deck infill are by others unless specifically noted
  • Wood blocking and structural components are excluded unless specifically noted
  • Dumpsters, sanitary facilities, rooftop safety systems, pedestrian protection, and hoisting or crane services are excluded unless otherwise stated
  • Police details and special site requirements, if required, are excluded
  • Electrical, telecommunications, mechanical, and plumbing disconnections and reconnections are by others
  • Work is to be performed during normal working hours unless otherwise noted
  • Pricing is based on visible conditions at the time of inspection; unforeseen or concealed conditions may result in additional costs
  • Winter conditions, weather delays, and environmental impacts are excluded
  • Access to the work area, including staging, storage, and coordination with other trades, is to be provided by others unless otherwise noted
  • Interior protection is excluded unless specifically noted
  • Permits and associated fees are excluded unless specifically stated